XeF2
Instructions

Always use gloves and a respirator
when working with XeF2.
Do not expose XeF2 to
moisture.
Things to turn on in the Service Corridor:
- Nitrogen
- XeF2
vacuum pump
Things to turn on at the machine:
- Nitrogen
Turret
- Local
Vacuum Turret

Inserting a sample
- Check
that all valves are closed
- Turn
on the pump (orange) and the N2 tank and set N2
pressure to 5psi
- Remove
the clamp from the front plate, open the N2 valve
- The
front plate will slide off once the pressure equalizes
- Insert
the sample
- Replace
the front plate and close the N2 valve
- Replace
the clamp on the front plate
- Open
the pump valve
- Wait
30 seconds then turn on the DMM and pressure sensor
- Wait
until the pressure goes as low as possible (<200mTorr*) this will be the
minimum pressure
Etching
-
Open the pump valve
-
Wait until the pressure reaches the minimum (about 1 minute)
-
Close the pump valve
-
Open the XeF2 valve
-
Wait 30 seconds *
-
Close the XeF2 valve
-
Wait 1 minute
-
Repeat all steps as necessary
Removing a sample
- Open
the pump valve (with all other valves closed)
- Wait
until the pressure reaches the minimum (<200mTorr)
- Open
the N2 valve
- Wait
5 minutes
- Remove
the clamp from the front plate
- Close
the pump valve
- The
front plate will slide off once the pressure equalizes
- Remove
the sample
- Replace
the front plate and close the N2 valve
- Replace
the clamp on the front plate
- Open
the pump valve
- Wait
30 seconds then turn on the DMM and pressure sensor
- Wait
until the pressure goes as low as possible (<200mTorr)
- Turn
everything off
*if the pressure does
not increase to >1.5mTorr within 5 seconds add XeF2 crystals
Adding XeF2 crystals
- Always use gloves and a respirator
- Minimize the exposure of XeF2 crystals to air
- Obtain the following, spatula, Teflon tape, plastic Petri dish
- Remove the XeF2 crystals from the acid cabinet (double bottled)
- Place the plastic Petri dish under the chamber in case of a spill.
- Unscrew the top from the XeF2 chamber, remove old Teflon tape, replace with new
teflon tape, set cap on top of the chamber but do not screw on.
- Remove the inner XeF2 bottle from the outer bottle keeping chamber and bottle exposed to air for the least amount of time possible, scoop 10-12 crystals from the bottle, set the cap on the bottle, pick up chamber top, place crystals in the chamber, close the XeF2 chamber.
- Purge the XeF2 stock bottle with N2 gas to remove air before closing.

procedure prepared by Francisco Tejada, Spring
2003;
modified by La Vida Cooper, Spring 2003.