Evaporator Instructions

Things to have ready:
- Clean
inside of bell jar and all surfaces inside the evaporator with wipes and
Acetone.
- Prepare
desired evaporation material, load material into proper boat.
Procedure
Things to turn on in the Service Corridor:
- Liquid
Nitrogen Tank
- At
the machine:
- Turn
on cooling water (if not already on)
- Turn
on compressed air (if not already on)
- Turn
on power box on the wall
- Turn
on power for Vacuum Gauge (Terranova unit)
- Turn
on power for Liquid Nitrogen Exhaust Line Heater

Running the machine:
- Press
button to start mechanical pump (Now the lights should work)
- Set
valves to the following position
- Vent
valve CLOSED (OFF)
- Roughing
valve CLOSED (OFF)
- Hi-Vac
valve CLOSED (OFF)
- Foreline
valve OPEN (ON)



(Diffusion pump takes about 15 minutes to warm up; the
following steps only need to be performed if the pump is cold (first
evaporation). Another note about
the diffusion pump is that it should not be operated unless the pressure at TC2
is near .001) Check pressure at TC2. If pressure at 0.01 or lower press
button to Start diffusion pump. If pressure above 0.01, continue with
procedure and press button to Start diffusion pump when it drops to 0.01.

- Check Vacuum Interlock light (green light)
- If lit: Press Up to open bell jar
- If not lit: OPEN Vent valve, wait for
light to turn green, press Up to open bell jar
- Place wafers on wafer tray, place weight on
top of the wafer.
- Check bell jar seal ring vacuum grease, if no
grease spread thin layer of grease on seal
- Press Down to close bell jar
- CLOSE Vent valve
- Press button to turn Diffusion Pump OFF
- CLOSE Foreline valve
- OPEN Roughing valve
- Wait for pressure on TC1 to approach 0.01
- OPEN Foreline valve
- Wait for pressure at TC1 and TC2 to approach
0.01
- Press button to Start Diffusion Pump
- Wait for pressure on TC1 and TC2 to level out
at 0.01
- CLOSE Roughing valve
- Turn on Liquid Nitrogen Line 1/8 turn
- Wait 30 seconds for Cold Trap to get cold
- OPEN Hi-Vac valve
- Turn on filament for UHV sensor (Filament
button on Terranova Unit)
- Wait for pressure in chamber to drop to 5E-5
Torr
- Turn on power switch for evaporation source
- Slowly turn up power
- Watch the evaporation to make sure that
material does not overflow
- Once material stabilizes turn up power to 100%
- Wait necessary time
- Turn power down to 0%
- Turn off power switch for evaporation source
- Turn off Liquid Nitrogen Line
- CLOSE Hi-Vac valve
- Turn off filament for UHV sensor
- OPEN Vent valve
- Wait for Green light
- Remove wafers and spent evaporation boat
- If there are more runs to be performed leave
Diffusion pump on
- Load new evaporation boat and wafers and
repeat procedure
If there are no more runs to be performed:
- Turn
off Diffusion Pump
- CLOSE
Bell jar
- CLOSE
Vent valve
- CLOSE
Foreline valve
- OPEN
Roughing valve
- Wait
for pressure at TC1 to drop to 0.01
- OPEN
Foreline valve
- Wait
for pressure at TC1 and TC2 to drop to 0.01
- CLOSE
Foreline valve
- CLOSE
Roughing valve
- Wait
10 minutes and turn off cooling water

procedure prepared by Francisco Tejada, Spring
2003;
modified by La Vida Cooper, Spring 2003.